New TSRE route editor tips & tricks

Collapse
This is a sticky topic.
X
X
 
  • Time
  • Show
Clear All
new posts
  • scottb613
    2500 Post Veteran


    • Apr 2003
    • 2848
    • Downeast Maine (soon)
    • ORTS

    #46
    Originally posted by muskokaandtahoe
    Getting Goku to add it was like talking him into letting me pull several of his teeth.
    Marathon Man style - LOL...


    Regards,
    Scott



    Sent from my iPad using Tapatalk
    <a href=https://www.trainsim.com/forums/filedata/fetch?filedataid=80663&type=full title=thumb_80663.png >thumb_80663.png</a>​ My Blender Models

    Comment

    • CSRX
      13500 Post Veteran



      • Oct 2005
      • 13646
      • Lincoln, ME
      • English
      • ORTS

      #47
      Vince,
      Not sure if mentioned, I was looking into the curvature of the railroad I am working on. In our timetable, there are sections that show the curve being "2 degree" and some that are "1-15 Degree". Is there a way to best match this in the sim?
      -Shawn K-
      MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
      ​

      Comment

      • Vince
        6500 Post Veteran

        • Nov 1999
        • 6961
        • Mohave

        #48
        Hi Shawn,

        Being that any marker set can be as much as a mile off depending on the location I just treat any curves as a pseudo spiral starting a curve with large radii sections transitioning to smaller.

        Translating a RR timetable you'd have to know what the notations mean. A 2 degree curve seems simple enough but the 1-15 looks possibly like a gradient notation? But together with the 2 degree value I don't have a clue as to what it means. That would possibly be explained in an employee manual.
        There's another measurement used for curves; "CHAIN" Now this is a value that could have something to do with the 1-15 part. I googled that (chain) some years back and decided that was getting waaay too involved with micro-protypical building and would add years to lay out to get it 'right'

        I use markers and satellite photos of where the track goes (or went) and if I'm a few degrees off I'll bet you'll never notice when driving a train nor will anyone else running the route.

        The biggest mistake builders make is crazy abrupt grade changes like +1 degree up to a -1 degree down. Terrible not to mention sloppy trackwork which reflects on the author so much more that a few degrees shift in a curve.
        Just keep the grade transitions nice and smooth and you'll love the result.
        Sorry I couldn't provide a translation of your timetable notations.

        regards,
        ............Vince ..............
        ...... Author NECv4 .......
        .... LIRR BUILD PHOTOS ....
        ...... Eschew Obsfucation ......

        On the The Statue of Liberty in New York Harbor there is a Tablet. On it is written:
        "Give me your tired, your poor, your huddled masses yearning to breathe free,
        the wretched refuse of your teeming shore, send these, the homeless, tempest-tossed to me,
        I lift my lamp beside the golden door!"

        Comment

        • scottb613
          2500 Post Veteran


          • Apr 2003
          • 2848
          • Downeast Maine (soon)
          • ORTS

          #49
          Originally posted by Vince
          The biggest mistake builders make is crazy abrupt grade changes like +1 degree up to a -1 degree down. Terrible not to mention sloppy trackwork which reflects on the author so much more that a few degrees shift in a curve.
          Like any of the Marias Pass routes...

          Regards,
          Scott
          <a href=https://www.trainsim.com/forums/filedata/fetch?filedataid=80663&type=full title=thumb_80663.png >thumb_80663.png</a>​ My Blender Models

          Comment

          • conductorchris
            2500 Post Veteran

            • Mar 2010
            • 2905
            • Vermont
            • General

            #50
            1-15 might be 1.15 degrees.

            Googling chainage probably won't help because railroads use a different chain measurement than the rest of the world in which (if I am remembering right) a chain is merely 100 feet. I know Jerry can chime in and set me straight.

            Christopher

            Comment

            • drelyea
              Senior Member
              • May 2010
              • 661
              • Big Johnson City, TN

              #51
              Hi,

              The 1-15 degree curve is 1 degree, 15 minutes. Or 1.25 degree.

              These come from the time the railroads used a table of curve radii that was measured in degrees. There used to be a pdf of a handbook over at Hawk's site that included the table.

              What I wound up doing in Tristate to "match" curves was test fit an initial 20 degree piece to the markers, then trial and error easements at the ends that gave me the best fit to the markers, and the next tangent. The reason for this was the Delta (keyboard doesn't have the upright equilateral triangle for that) was actually more critical. I'm still looking for the A1t1000r 3 degree, 17 minute, 44 second piece.

              IIRC not many of the curves in Tristate were full degree ( or degree and fraction ) curves from the table, many were either adjusted to fit the terrain, or were a compound curve, drawn to fit the terrain or available property or both.

              Of the valuation maps I have (Erie, DL&W, NYS&W, L&NE, and a few from the others), only the Erie's set of Property maps with a never built railroad in the D&H Canal bed (mostly) had chains as a unit of measure, and then only for the property lines. The ROW centerline was measured in feet. (This is likely the closest thing to a Valuation map the world might ever see of the D&H canal)

              Doug Relyea
              Making stuff that works, using outdated Software on outdated Hardware.sigpic

              Comment

              • scottb613
                2500 Post Veteran


                • Apr 2003
                • 2848
                • Downeast Maine (soon)
                • ORTS

                #52
                Hi Doug,

                Much of the technical stuff is far more than I've ever done in RE - I can personally attest that you make some of the smoothest track runs I've seen in TS - really nice work - sir...

                Regards,
                Scott
                <a href=https://www.trainsim.com/forums/filedata/fetch?filedataid=80663&type=full title=thumb_80663.png >thumb_80663.png</a>​ My Blender Models

                Comment

                • charlie
                  1500 Post Veteran
                  • Nov 1999
                  • 1843
                  • Maryland, USA

                  #53
                  Originally posted by drelyea
                  The 1-15 degree curve is 1 degree, 15 minutes. Or 1.25 degree.

                  These come from the time the railroads used a table of curve radii that was measured in degrees. There used to be a pdf of a handbook over at Hawk's site that included the table.
                  Railroad engineers in the U.S. use degree of curvature to determine the sharpness of a curve. The definition is found by connecting two points on an arc with a 100-foot chord, drawing radii from the center of the arc to the chord end-points, and then measuring the angle between these radii lines.

                  Instead of using an arc as is commonly used in road work, this image shows the chord method for railroad work.

                  regards,
                  charlie
                  Attached Files

                  Comment

                  • landnrailroader
                    4000 Post Veteran



                    • Nov 1999
                    • 4171
                    • Jacksonville,, FL, USA.
                    • ORTS

                    #54
                    While the definition you have given of a curve is correct, I once surveyed some railroad curves in
                    the Vanderbilt surveying class, which all engineer students, regardless of major had to take. To
                    do it with a transit, is to place the transit over the stake that will start the spiral, and back sight
                    on the previous stake to align the transit to the curve. Most railroads use a 10-chord spiral, so
                    you take the proposed length of the spiral and calculate the chords for 10 pieces that increase
                    in degree of curvature by .1xdesired degree of curve. Thus if the curve is to be a 2 degree
                    curve, each increment will be .2 degrees, and the chords may be more or less than 100'. Once
                    in the body of the curve, you would back-sight on the previous stake and turn the transit 2
                    degrees, then measure (chain i.e.) 100' out along the new chord. It is also possible to leave
                    the transit at the first location and turn the transit incrementally for each segment, i.e.
                    chord, and most handbooks will have tables for that. Knowing that I was interested in
                    railroads, my team was assigned to lay out a railroad track for our final exam, while others
                    got roads. My team had the urge to kill until they realized that the chord method was
                    easier than the arc method.

                    Landnrailroader

                    Comment

                    • CSRX
                      13500 Post Veteran



                      • Oct 2005
                      • 13646
                      • Lincoln, ME
                      • English
                      • ORTS

                      #55
                      Thanks for all the responses folks! I noticed some of the curves I was a bit off with, but so far doing my best to match. To be honest, running the real lines myself daily, it will bug me knowing something isn't correct, but if others don't notice it, then that is great. Grade changes have always been a stickler for me, and if they are rough transitions like many many routes that are out, they will not be used by me. This is why I mainly have Paul Charland routes, or my own. I haven't found many other routes including payware, that are smooth when it comes to this.

                      the 05m straight I noticed worked better than the 10m straight I was always working with, so many thanks for that tip!

                      I pushed my route for a total of 20 miles. the long tangents are probably the most difficult part for me to keep, though I did find a curve section that blends well for the most part, and to be honest, some of the long tangents we have, over the years, have shifted off the original alignment anyways, giving off that slight curve look.
                      -Shawn K-
                      MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
                      ​

                      Comment

                      • landnrailroader
                        4000 Post Veteran



                        • Nov 1999
                        • 4171
                        • Jacksonville,, FL, USA.
                        • ORTS

                        #56
                        Adjacent piece not loaded &amp; database line visible, track (or road) is not

                        Colleagues,

                        I have a minor problem, minor in that I have a backup and have not done too much work,
                        but I have a question.

                        I was using RE and CatMaster to place wire & gantries on the Virginian route that will come
                        sometime after I complete the MCOA2. Suddenly I noticed that I had a database line through
                        a tunnel that should have had 2x100 meter tunnel pieces, but there was no track piece
                        visible. Also, I got the "adjacent piece not loaded etc." error if I selected a visible piece which
                        in this case is a 50 meter bridge piece on either end of the tunnel.

                        This begs the question: Orphan poles are relatively easy to correct in TSRE but is there
                        a way to fix this situation. In other words, can one delete the invisible pieces and then replace
                        them? Also, I note that the "W" key does not turn off terrain rendering, although the ""/"
                        key does allow diving below ground.

                        And lastly I notice that tips & tricks seem to have come to an end in early May. I would
                        suggest that anyone that works out a fix for some obscure error, like I mentioned above,
                        could help a lot by including an instruction on the fix. I have started using TSRE more
                        and more, although on the MCOA2 I am mainly using the alignment function to fix skewed
                        bridges etc.

                        J. H. Sullivan
                        (aka landnrailroader)

                        Comment

                        • GokuMK
                          Senior Member

                          • Oct 2015
                          • 729
                          • Poland

                          #57
                          Instead of MSRE "W" key, you can use menu action View -> Hide terrain shape.

                          You can remove TDB lines with no shape. You need to separate the line from other track, but leave at least one good track.
                          Then select the one good track and use option Hacks -> Remove TDB Vector. Make backup before using it because you can damage the database if you use it the wrong way.

                          Comment

                          • Vince
                            6500 Post Veteran

                            • Nov 1999
                            • 6961
                            • Mohave

                            #58
                            Hi Jerry,

                            Missing track with TDB still showing can be fixed as Goku advises.

                            I have been successful in fixing the situation you're in by using the [Hacks] button on the Track Object Panel (at bottom)TSRE_Hacks_Button.jpg
                            In your case you would select the [ Remove TDB Vector (Remove TrItems First) ] bar.

                            A "Vector" can be defined as all the track between two Red Poles or Red Pole and EndNode or two EndNodes.

                            The above 'hack' removes the track from the track database leaving the track as static objects.
                            I have used this and it does work. Backup first!

                            Now all is needed is to click on each track section between the two red poles to restore them to the TDB and at the same time you would add the two missing 100 meter track sections.

                            I see Goku has responded with a short-to-the-point suggestion . . . good one! I'm waaaay too long winded.

                            As far as database line present with NO track, a 'Rogue Blue Pole' I don't know a way. I had asked Goku about the possibility of being able to remove 'Rogue' database lines by clicking on the number displayed but no joy there yet but am hoping.

                            Re the "W" key show/hide terrain. . . . . In TSRE you can do it with Alt+V+H or use the Menu.

                            regards,
                            Last edited by Vince; 06-01-2018, 15:20.
                            ............Vince ..............
                            ...... Author NECv4 .......
                            .... LIRR BUILD PHOTOS ....
                            ...... Eschew Obsfucation ......

                            On the The Statue of Liberty in New York Harbor there is a Tablet. On it is written:
                            "Give me your tired, your poor, your huddled masses yearning to breathe free,
                            the wretched refuse of your teeming shore, send these, the homeless, tempest-tossed to me,
                            I lift my lamp beside the golden door!"

                            Comment

                            • landnrailroader
                              4000 Post Veteran



                              • Nov 1999
                              • 4171
                              • Jacksonville,, FL, USA.
                              • ORTS

                              #59
                              Now I am confused

                              Between Vince & Goku I am really confused now. Attached is a image of the error. Actually there
                              is a 50M bridge piece (selected, blue) at one end, and a curve piece at the other, but no visible
                              tunnel pieces in between. I'll back it up just so I can try more than once if I have to, but I was
                              just piddling with a backup copy anyway while perfecting how to provide Virginian style gantries
                              with the route anway when this occurred in RE. Theoretically, I could rebuild the database but
                              for some weird reason when I do the program never comes to and end, and continues testing
                              world tiles beyond the limits of the route, and as we know that is a iffy procedure anyway, so I
                              want to learn the better way. Goku, if you can, even if it takes a separate utility, perhaps a
                              database rebuild process would be helpful.

                              J. H. Sullivan
                              Attached Files

                              Comment

                              • landnrailroader
                                4000 Post Veteran



                                • Nov 1999
                                • 4171
                                • Jacksonville,, FL, USA.
                                • ORTS

                                #60
                                Vince,
                                Goku,

                                It is also possible that the shallow angle of the track crossing the tile boundary caused the
                                problem in the first place. I didn't lay this area, it came to me from Simon van de Laak
                                and eventually I plan to complete the route.

                                Vince, when you refer to a vector between two poles, does this mean that I should
                                remove the vectors between poles on either side of the "gap". There are some sidings
                                on the line but it is probably 3 or 4 miles between turnouts, i.e. red poles.

                                J. H. Sullivan

                                Comment

                                Working...