Is it possible, while running an activity in OR, to display the work order while in the sim? For example; in MSTS, F11 displays the timetable and work order any time you wish while in the sim.
I do not see anywhere that this is addressed in the OR manual. Takes some time to write down all the pick ups and drops at various industries in a complex activity before running OR.
A second thought on a different subject.....I get tons of wheel slip warnings on dry track in OR for no obvious reason. Is that a known problem? I have my adhesion in OR set to 130% and random change to 20% with the proportion to rain and snow checked. Is there a recommended setting for this on dry track?
I do not see anywhere that this is addressed in the OR manual. Takes some time to write down all the pick ups and drops at various industries in a complex activity before running OR.
A second thought on a different subject.....I get tons of wheel slip warnings on dry track in OR for no obvious reason. Is that a known problem? I have my adhesion in OR set to 130% and random change to 20% with the proportion to rain and snow checked. Is there a recommended setting for this on dry track?






Comment