I have a non-TSRE generated activity I've been planning for myself - just a path with various goods wagons etc inserted for me to move around. However I have an AI train stop at a station nearby, then continue on its way near the start of the activity. Since I have to cross multiple tracks and switches from my start point, it was easier to let it go first before fooling around shunting and causing mayhem as I do.
So I placed a wait point before a switch and signal that is entering the main line ( from a loco siding) for 3 mins to give it time to clear. However I don't get any indication that I need to stop. The track monitor (F4) directs me through and doesn't show a red which is what I thought a 'wait point' might do. So not sure if what I'm asking or expecting is what should happen or not? Or is it just for ai trains?
Any help greatly appreciated.
So I placed a wait point before a switch and signal that is entering the main line ( from a loco siding) for 3 mins to give it time to clear. However I don't get any indication that I need to stop. The track monitor (F4) directs me through and doesn't show a red which is what I thought a 'wait point' might do. So not sure if what I'm asking or expecting is what should happen or not? Or is it just for ai trains?
Any help greatly appreciated.






Comment