Not strictly a TSRE question, but I think the track laying experts lurk here. On laying the switches at Baird, TX on the T&P route, the freight siding comes off the straight section of the switch while the station main takes the divergent. Since this comes right after the previous mainline divergent switch, it is hard to manually change the switch without hitting "pause". Since the resting position of this switch in prototype is divergent rather than straight, is there a way to have the default position on this switch divergent, being able to manually switch to straight if I want to use the freight track? If so, it should be relatively simple to program the signals for that.
Thanks.
Dan
Thanks.
Dan






Comment