In the library, there is the Kingsport and Blue Ridge Subs. which were my very first efforts at route building way back in 2001/2002. Can't believe I've been at this for 22 years but then I retired from CSX in the spring of 2001. I tried to make every curve precise in radius knowing what the degree of curve was from track charts. So both of them are LOADED with dynamic pieces. I do have a plan to revise them, eliminating many dynamic pieces since M-tracks has a pretty good collection of curves and that, with X-tracks means that almost all curves can be reproduced precisely, or near enough, without so much dynamic. I have piddled with the Kingsport so far and have redone the Erwin, TN and Kingsport, TN yards to be more correct. I've also redone the main track from Elkhorn City, KY through the first two tunnels. The 2nd tunnel was originally done with dynamic, but now I have redone it with the correct degree of curve and then since we don't have tunnel pieces in those curve values, I have used 33ft. tunnel sections that came out of the library as I recall, some time ago. Those are also used on the CNO&TP 3rd district which is in the library, and will be seen in my next release which will be an improved version of the Knoxville Division. In looking at those old routes, I am really suprised that I did them fairly well. Nowhere near as good as I would demand of myself now, but pretty good for first efforts. Dynamic had it's worst problems on grades couple with long curves and so I know that the Loops on the east slope of the Blue Ridge will be better.
And guys, those loops were badly damaged by Helene and the track from Spruce Pine all the way to Erwin essentially does not exist now. The Toe/Nolichucky River did a job there with flood levels never seen before. CSX has guessimated it will take $200M to rebuild and I have serious doubts that can be justified, now that coal is dead, and not much else goes that way. YouTube had a number of clips that are scary to watch.
Jerry
And guys, those loops were badly damaged by Helene and the track from Spruce Pine all the way to Erwin essentially does not exist now. The Toe/Nolichucky River did a job there with flood levels never seen before. CSX has guessimated it will take $200M to rebuild and I have serious doubts that can be justified, now that coal is dead, and not much else goes that way. YouTube had a number of clips that are scary to watch.
Jerry






Comment