At least that is what TRAINS called it in a issue from around 1964. Between 1961 & 1963, with the help of Oman Contruction Co. (then HQ was in Nashville), I don't know if the company still exists, several miles of new track was laid between Danville, KY & Oakdale, TN. The purpose was to eliminate the tunnels that provided a reason to call the line, THE RATHOLE. The cost of this activity exceeded the cost of the entire original line when constructed in the 1875-1885 period. A portion of the new line was between Helenwood & Robbins, TN and this eliminated 3 tunnels, a restricted speed bridge, and heavy grades north & south down into, and out of, the New River valley. This New River joins the Clear Fork R. a few miles to the northwest to form the S. Fork of the Cumberland R. The track from Helenwood down to the east end of the old bridge stayed in service at least until after I left the Southern in 1978. This was to service the Brimstone RR, famous with railfans for it's Shay locomotive. Southern acquired the Brimstone sometime between 1956 & 1965 but it is abandoned today. (Included in this route however)
To reduce the grade required bridging the New River at a higher elevation, like more than 300 feet above the water level. The bridge was (and is) immense, 1607 feet in length. So here is a screen capture out of TSRE. I find it relatively easy to place this structure, which is in 3 parts, and then use key in's to properly position it.
landnrailroader NEW_RIVER_ORTS.jpg
To reduce the grade required bridging the New River at a higher elevation, like more than 300 feet above the water level. The bridge was (and is) immense, 1607 feet in length. So here is a screen capture out of TSRE. I find it relatively easy to place this structure, which is in 3 parts, and then use key in's to properly position it.
landnrailroader NEW_RIVER_ORTS.jpg





Comment