    I have several routes in the works but succumbed to one more which would be the Lebanon Branch and the Greensburg Branch which turns to the south off of the Lebanon Branch. The Greensburg branch has been gone for a long time and the Lebanon Branch since aroundd 1980 or so. I am digitizing it from a topographic base of maps from 1953 and it will include only roads that were present then. But when you take a topo map .kmz file, easily obtained from USGS sites and open it in Google Earth (the PC based version) there is some distortion and then topographic maps are never all that accurate as to lat/long coordinates. For their initended purpose that is okay. So what I do is digitize off the map, and then correct the digitizing as best as I can DIGITIZE2A.jpg Note that as the blue line progresses left to right, it is following a light colored line in the B/W image. This is better seen in B/W than in color. Note that the points on the line then slide up closer to the light line above the blue which is a road when the topo map is consulted. The map does not show a parallel road so the "road" seen below the blue line is the old railroad bed. Most of the B/W images are from 1995-1997 and at that point the railroad had been gone around 15 years +- and erosion & farming had not yet wiped it out completely. So now I will select each dot in turn with the mouse and move it to the center of the "road" below, which is actually disturbed ground and what is left ot the right of way.

    In the Mainline route just released yesterday, this line starts at Lebanon Jct., KY and on the not yet released Kentucky Div. it comes to Sinks, KY and continues to Corbin. L&N did not use letter prefixes for mileposts and none were assigned to this group of branches as they were gone by the time CSX started cataloguing lines. However I am using a prefix of "L" just to identify the mileposts in the marker files because I will include 2 miles or so north & south of Lebanon Jct. on the Mainline, as well as a couple miles north of Sinks on the way to Cincinnati. This line also intersects the Southern's CNO&TP 2nd District at a point 10 miles or so south of Danville, KY.

    I should add that the reason I do this two-step process is there are some area where the right of way has completely disappeared and so I will use this method to get the line as correct as possible on either side and then "fake it till I make it" on the totally missing area.

    Jerry
    Last edited by landnrailroader; Today, 07:13.
  • tarrant75
    Senior Member


    • Jul 2004
    • 597
    • The East, but wanting to go back West
    • English, 'Merican, Australian and Sarcasm
    • MSOR

    #2
    I definitely understand the ROW disappearing. I've been working on a personal route, and the really hard part in this case that it travels through an EXTREMELY heaving forested region, so that are areas that it completely disappears.

    There was also one in Australia I was looking at that the ROW was prepared, bridges and telegraph lines were added, but the money ran out during World War One and it wasn't finished. The railway finished half of it in 1984, but the other half, which also includes a tunnel fully drilled (by hand of course) and lined. If you ever get time and want to feel defeated, research the Sandy Hollow to Maryvale line. The Sandy Hollow to Gulgong part was built, but Gulgong to Maryvale still sits... not sure if abandoned is the right word, but it's there regardless.

    Jerry, you are doing an amazing job of putting all these lines in, and I truly thank you.