I have had a number of requests for the L&N Mainline sub., i.e. Louisville to Nashville and so I am working on that now, expecting to release it as incomplete around the end of the year. I'll be away from my PC for two weeks, Sept. volunteering as a docent on the Cumbres & Toltec Scenic, and then a Kelly Tour out of Savannah in late Oct.. that includes 3 short rail segments that are not on my mileage list except that I have been over the route of the Blue Ridge Train (Staunton, VA west & return) but it was at night on a C&O train more than 50 years ago. The most complex part of the mainline sub. will be recreating the Green R. bridge at Munfordville, KY but I have a sketch of it, acquired before I retired.
Some explanation of names, in case confusion occurs. In the beginning, about 1850 or so, this line was referred as the Louisville & Nashville main stem. There was also the Bardstown branch and the Lebanon branch, and later the Memphis line. The Glasgow RR appears as a branch but was really a independent company that depended on the L&N for crews and equipment and then was later owned by the L&N, now CSX. Even in the 1940s/50s when I was a budding railfan and my uncle was a engineer on the line, he referred to it as the L&N Main Stem, 1st & 2nd subdivisions. The break was Bowling Green, KY, really Memphis Jct. Then it was also called the Louisville Division, 1st & 2nd subs. Under SCL Family lines it was the Louisville Division, "000" line. And under CSX it is the Mainline Sub. and I am not sure what division it is part of. Mileposts all the way from Louisville to Mobile and I think also New Orleans have the "000" prefix. Lines off of that have prefixes like "00H" for the Henderson Sub. (formerly division) between Evansville & Nashville (Amqui Jct.). While the "000" line goes through Nashville downtown and was the passenger line, through freight trains turned off at Maplewood, north of downtown and followed the "0BA" line to Radnor Yard and beyond to Brentwood. As a part of this and at least 3 other lines, if I remain upright long enough, I will include the Nashville Terminal which has tracks as accurate as I could make them and most major roads & streets. Radnor Yard is "faked in". There is a personal story about Radnor.
In 1992 or so, a very fine man, now deceased, was made Chief Engr. M/W at CSX and he found out that I could do pie charts etc. on a CAD system so he asked if I could shade in parts of a major yard that they were going to do maintenance on. For example, there might be 56 tracks in the classification "bowl" and he wanted to take them out of service for repair, 7 at a time, so 7x8 = 56. He said he wanted to do Radnor, and did did I need a map to go by. "No sir, I watched them build that yard back in 1954". My mother collected antiques and her favorite dealer lived about 1/2 block west of a bridge over nearly the top of the hump. His name was Jerry too and we attended the same church for some 18 years until he passed a few years ago. His wife still attends and gets a hug every week from me and my wife.
There will be a bungalow at every active road crossing, and control point. There will also be the currently correct signage at every passively protected crossing. All mileposts will be present.
Jerry
Some explanation of names, in case confusion occurs. In the beginning, about 1850 or so, this line was referred as the Louisville & Nashville main stem. There was also the Bardstown branch and the Lebanon branch, and later the Memphis line. The Glasgow RR appears as a branch but was really a independent company that depended on the L&N for crews and equipment and then was later owned by the L&N, now CSX. Even in the 1940s/50s when I was a budding railfan and my uncle was a engineer on the line, he referred to it as the L&N Main Stem, 1st & 2nd subdivisions. The break was Bowling Green, KY, really Memphis Jct. Then it was also called the Louisville Division, 1st & 2nd subs. Under SCL Family lines it was the Louisville Division, "000" line. And under CSX it is the Mainline Sub. and I am not sure what division it is part of. Mileposts all the way from Louisville to Mobile and I think also New Orleans have the "000" prefix. Lines off of that have prefixes like "00H" for the Henderson Sub. (formerly division) between Evansville & Nashville (Amqui Jct.). While the "000" line goes through Nashville downtown and was the passenger line, through freight trains turned off at Maplewood, north of downtown and followed the "0BA" line to Radnor Yard and beyond to Brentwood. As a part of this and at least 3 other lines, if I remain upright long enough, I will include the Nashville Terminal which has tracks as accurate as I could make them and most major roads & streets. Radnor Yard is "faked in". There is a personal story about Radnor.
In 1992 or so, a very fine man, now deceased, was made Chief Engr. M/W at CSX and he found out that I could do pie charts etc. on a CAD system so he asked if I could shade in parts of a major yard that they were going to do maintenance on. For example, there might be 56 tracks in the classification "bowl" and he wanted to take them out of service for repair, 7 at a time, so 7x8 = 56. He said he wanted to do Radnor, and did did I need a map to go by. "No sir, I watched them build that yard back in 1954". My mother collected antiques and her favorite dealer lived about 1/2 block west of a bridge over nearly the top of the hump. His name was Jerry too and we attended the same church for some 18 years until he passed a few years ago. His wife still attends and gets a hug every week from me and my wife.
There will be a bungalow at every active road crossing, and control point. There will also be the currently correct signage at every passively protected crossing. All mileposts will be present.
Jerry