I needed a break from the Ohio Division I have been working... I should say struggling with.
I am currently tracing out the old DT&I for a overhaul of the track and the addition of DEM data.
The original DT&I route was decent. However, I wanted to add in dem data for the terrain and correct track errors. Especially with what is Vauces. Living quite literally in the routes backyard in Southern Ohio I am familiar a bit of the route. No fault of the route author. I find myself comparing between Google Earth and Lidar data to pin point the routes road bed.
The plan was to add the DEM data, build tracks and roads present from the DT&I track charts that I have of the entire system. I would like to lay the track from Ironton to Flat Rock Michigan. I could do a pre 1981 routing which keeps Summit Hill open, or post 1981 version which routes the DT&I up the C&O from Greggs Hill to Vauces in Chillicothe down VA Jct over to the Scioto Cutoff to Connect into Chillicothe over the Ohio Division where it would jump onto the CH&D at Musselman to Washington Courthouse.
Right now I am thinking on doing the pre 1981 trackwork. This is definitely pre GTW operations, and before the portion through Waverly was officially abandoned, So the time period I am thinking would be while the DT&I was under PC control.
I could release a tracks and roads only for those who are interested to add scenery. If there is interest I can go that route.
I am currently tracing out the old DT&I for a overhaul of the track and the addition of DEM data.
The original DT&I route was decent. However, I wanted to add in dem data for the terrain and correct track errors. Especially with what is Vauces. Living quite literally in the routes backyard in Southern Ohio I am familiar a bit of the route. No fault of the route author. I find myself comparing between Google Earth and Lidar data to pin point the routes road bed.
The plan was to add the DEM data, build tracks and roads present from the DT&I track charts that I have of the entire system. I would like to lay the track from Ironton to Flat Rock Michigan. I could do a pre 1981 routing which keeps Summit Hill open, or post 1981 version which routes the DT&I up the C&O from Greggs Hill to Vauces in Chillicothe down VA Jct over to the Scioto Cutoff to Connect into Chillicothe over the Ohio Division where it would jump onto the CH&D at Musselman to Washington Courthouse.
Right now I am thinking on doing the pre 1981 trackwork. This is definitely pre GTW operations, and before the portion through Waverly was officially abandoned, So the time period I am thinking would be while the DT&I was under PC control.
I could release a tracks and roads only for those who are interested to add scenery. If there is interest I can go that route.






Comment