A few years ago, I started doing the Eastern Kentucky Division and I wanted to include, as best as I could, the original construction of the two railroads that made the initial start toward the coal fields. As these crossed the Kentrucky Division, one in Winchester and the other in Richmond, I went ahead and included the Kentucky Div. from a point a few miles north of Winchester to a few miles south of Richmond. In doing the Corbin to Knoxville line, I had included a few miles north of Corbin, so now I am finishing out the track which will include the mainline of the former Kentucky Central from Covington, KY to Sinks, and the former Lebanon Branch from Mt. Vernon to Corbin. Note that the Lebanon "branch" was the L&N's original line from Lebanon Jct., Ky to Corbin and was for a few years a main line, hence there is a change in mileposts at Sinks. Sinks is mile 137 from Louisville and mile 151.8 from Cincinnati, and the distance between the two mileposts is 4027 feet. Cincinnati to Sinks was the Kentucky Central which then had trackage rights over the L&N into Corbin until it was acquired by the L&N. This route figures in my personal history. My uncle, J. Harry Eubank, who retired as a passenger engineer in 1958 and passed to the railroad in heaven in 1974, ran this Louisville to Corbin route many times as a fireman between his hire year of 1907 and promotion to engineer in 1917. The line was abandoned from a few miles east of Lebanon Jct. (which is now a railroad museum line) and Mt. Vernon where there is large quarry that loads unit trains of material.
There is one other branch that still exists, this being from Paris to Maysville, Ky. It is no longer CSX but is operated by a shortline. However it is not a through route evidently because the latest aerials show a number of cars stored on the main track near the Maysville end of the branch. It will be included.
The mainline was double track for the most part, for many years but when TCS was installed 40 years or so ago, some double track was shortened or removed and now that coal loadings are way off, there are sections that exist on a 2020 track chart, that are now gone. I will be back dating the route to around 1985 when it had TCS and a lot of long sidings or double track. There are many tunnels, some holding double track and others that use two essentially parallel tunnels and one instance where one track used a tunnel and the other bypassed around the tunnel with a deep cut.
Jerry
There is one other branch that still exists, this being from Paris to Maysville, Ky. It is no longer CSX but is operated by a shortline. However it is not a through route evidently because the latest aerials show a number of cars stored on the main track near the Maysville end of the branch. It will be included.
The mainline was double track for the most part, for many years but when TCS was installed 40 years or so ago, some double track was shortened or removed and now that coal loadings are way off, there are sections that exist on a 2020 track chart, that are now gone. I will be back dating the route to around 1985 when it had TCS and a lot of long sidings or double track. There are many tunnels, some holding double track and others that use two essentially parallel tunnels and one instance where one track used a tunnel and the other bypassed around the tunnel with a deep cut.
Jerry






Comment