So I figured I would start this now as I feel I am at a point to start making some kind of updates, and will continue doing this as they become available.
The Ohio Division was part of the St Louis Mainline and connected the Parkersburg Branch which connected the West End ( Mountain Sub )
Reworking this is so much easier. Since early November it has been at a standstill as I was on 60-hour weeks at work.
To speed up the process I will most likely use freeware objects and for route specific stuff build it myself. This is actually been the BIGGEST hold up with this route.
The route sports 3 different signal systems C&O, B&O, and NW signals. I thought about upgrading these to more modern stuff.
Chillicothe Yard will be reworked a bit and an operational turntable installed at some point here.
The plan is to rework portions of the track seeing that I have zero time to relay some 200 miles of track.
Things have to be removed from the route for good reason, things installed and lots of custom objects need to be made.
Pic 1 shows a rough scene of a very early Queensgate.
Pic 2&3 is of Vauces just outside of Chillicothe.
Pic 4 is of an early Parkersburg High Yard.
Pic 5 is at Chillicothe where rework will occur. I have already placed Union Depot ( DO Tower ) that I created in Blender which still has to be finished.
Pic 6 shows the East end of the yard in Chillicothe and the unique layout B&O set it up as.
The plan is to rework portions of the track seeing that I have zero time to relay some 200 miles of track.
Things have to be removed from the route for good reason, things installed and lots of custom objects need to be made.
Pic 1 shows a rough scene of a place called Vauces outside Chillicothe OH and Pic 2 is another of the same place/
Pic 3 is of Parkersburg High yard.
Pic 4 is at Chillicothe where rework will occur. I have already placed Union Depot ( DO Tower ) that I created in Blender which still has to be finished.
Pic 5 is at the far east end of Chillicothe and looking at the yard there. That was a rough layout due to the yard ladder and how the prototype is set up.
East of Chillicothe is very undulating so running it keeps me on my toes a bit.
Right now the hot items are extending a siding from West Junction to near a place called Byer. The line is predominately single-track with passing sidings.
Screenshot 2024-12-24 055550.png
Screenshot 2024-12-20 195307.png Screenshot 2024-12-20 195229.png Screenshot 2024-12-20 194959.png
. Screenshot 2024-12-20 194532.png
Screenshot 2024-12-20 194812.png
The Ohio Division was part of the St Louis Mainline and connected the Parkersburg Branch which connected the West End ( Mountain Sub )
Reworking this is so much easier. Since early November it has been at a standstill as I was on 60-hour weeks at work.
To speed up the process I will most likely use freeware objects and for route specific stuff build it myself. This is actually been the BIGGEST hold up with this route.
The route sports 3 different signal systems C&O, B&O, and NW signals. I thought about upgrading these to more modern stuff.
Chillicothe Yard will be reworked a bit and an operational turntable installed at some point here.
The plan is to rework portions of the track seeing that I have zero time to relay some 200 miles of track.
Things have to be removed from the route for good reason, things installed and lots of custom objects need to be made.
Pic 1 shows a rough scene of a very early Queensgate.
Pic 2&3 is of Vauces just outside of Chillicothe.
Pic 4 is of an early Parkersburg High Yard.
Pic 5 is at Chillicothe where rework will occur. I have already placed Union Depot ( DO Tower ) that I created in Blender which still has to be finished.
Pic 6 shows the East end of the yard in Chillicothe and the unique layout B&O set it up as.
The plan is to rework portions of the track seeing that I have zero time to relay some 200 miles of track.
Things have to be removed from the route for good reason, things installed and lots of custom objects need to be made.
Pic 1 shows a rough scene of a place called Vauces outside Chillicothe OH and Pic 2 is another of the same place/
Pic 3 is of Parkersburg High yard.
Pic 4 is at Chillicothe where rework will occur. I have already placed Union Depot ( DO Tower ) that I created in Blender which still has to be finished.
Pic 5 is at the far east end of Chillicothe and looking at the yard there. That was a rough layout due to the yard ladder and how the prototype is set up.
East of Chillicothe is very undulating so running it keeps me on my toes a bit.
Right now the hot items are extending a siding from West Junction to near a place called Byer. The line is predominately single-track with passing sidings.
Screenshot 2024-12-24 055550.png
Screenshot 2024-12-20 195307.png Screenshot 2024-12-20 195229.png Screenshot 2024-12-20 194959.png
. Screenshot 2024-12-20 194532.png
Screenshot 2024-12-20 194812.png





)
Comment