After releasing the Alaska route, the internal quesiton was "What Next". I have a complete version of the L&N KD Sub. nearly done, but there has been some desire from others to get the N. Montana line, so I started back on that. I had all roads in place as far north as Lewistown and most of the roads beyond there to Winifrede & other branches. On this route, one can go for miles after Lewistown without any road to speak of other than farm paths from field to field. Towns are small too. So I have started to put in the roads moving toward Great Falls. Last year, I extended the route past Great Falls to the end of the branch which was some 60 miles NW of GF and there are a couple of small, and one medium size town along that branch. I also added more of the Great Northern so that there is a physical connection between the GN(BNSF) and what is now the Central Montana railroad which operates 100 miles more or less of the former Milwaukee Road line and 40 or so of the GN line so as to connect to the outer railroad world. Although I had put ballast transfers in, these do not work well with TSRE or ORTS and so as I piddle along, I am removing them and hopefully one of the real artists among us will "paint" the ballast in. I should point out that the pinkish tone of the ballast was done by Lukas Lussar and while it is good, I really don't know what the correct color would be. Milwaukee Rd. used river rock for a lot of their ballast while the GN(BNSF) uses granite. I will use this thread to report progress on the route and I plan to release it with mileposts & most crossings but I do not believe the Milwaukee Road was signalled on this line. In old times, there was one passenger train that connected at Harlowton with passenger trains there but it was long gone by the time the last mainline passenger train died in 1961. When released it won't be "incomplete" but super detailers should have a lot of fun with it.
Jerry







Comment