The fun continues... completed the Clinton Curve, which was used for many publicity photos over the CNW years...
The guesswork started with a couple pieces of dynamic track to get an approximate radius, which worked out to be 250m with some tweaks here and there. It's all individual pieces, which took a lot of trial and error to get lines up correctly, starting with 20d's and moving to 01d and 05d pieces.
The curve support had been a huge monolithic scenery object before, but I've completely replaced that with track piece specific pieces to form the viaduct, ballasted deck, and girder bridges by using WorldFileHacker. More on that in a later post.
Looking south from halfway in Clinton Curve and down the station throat
capture_5100092.jpg
Looking northwest from the same spot at Northwest Junction, where the Geneva Sub splits to Omaha on the left, and the Harvard and Kenosha Subs split to Madison and Milwaukee on the right:
capture_5100091.jpg
Making sure the 250m radius curve has no collisions between tracks...
capture_5100093.jpg
Six tracks become four as the center two tracks split directions...
The left side continues to Clybourn where they split into the Kenosha Sub and Harvard Sub, while the right side will become the Geneva Sub.
capture_5100094.jpg
There's still a little more work to be done, but this was by far the biggest rock to climb for the week.
Just beyond Northwest Junction, I need to rebuild a single curve for the Kenosha/Harvard into the Erie Street interlocking plant, and then a set of reverse curves on the Geneva Sub at Noble Street tower, which is where the MILW out of Union Station and the CNW briefly converge to form a 7 track main out to Western Avenue aka Tower A2...
Once those stretches are done, the entire route will have be fully transitioned to 4m track spacing.
The guesswork started with a couple pieces of dynamic track to get an approximate radius, which worked out to be 250m with some tweaks here and there. It's all individual pieces, which took a lot of trial and error to get lines up correctly, starting with 20d's and moving to 01d and 05d pieces.
The curve support had been a huge monolithic scenery object before, but I've completely replaced that with track piece specific pieces to form the viaduct, ballasted deck, and girder bridges by using WorldFileHacker. More on that in a later post.
Looking south from halfway in Clinton Curve and down the station throat
capture_5100092.jpg
Looking northwest from the same spot at Northwest Junction, where the Geneva Sub splits to Omaha on the left, and the Harvard and Kenosha Subs split to Madison and Milwaukee on the right:
capture_5100091.jpg
Making sure the 250m radius curve has no collisions between tracks...
capture_5100093.jpg
Six tracks become four as the center two tracks split directions...
The left side continues to Clybourn where they split into the Kenosha Sub and Harvard Sub, while the right side will become the Geneva Sub.
capture_5100094.jpg
There's still a little more work to be done, but this was by far the biggest rock to climb for the week.
Just beyond Northwest Junction, I need to rebuild a single curve for the Kenosha/Harvard into the Erie Street interlocking plant, and then a set of reverse curves on the Geneva Sub at Noble Street tower, which is where the MILW out of Union Station and the CNW briefly converge to form a 7 track main out to Western Avenue aka Tower A2...
Once those stretches are done, the entire route will have be fully transitioned to 4m track spacing.