    Well, took a break from working on the VTR CLP Whitehall Subdivision, and laid track between Sebago Lake Siding, and Steep Falls, Maine.

    Passing the Northwest portion of Sebago Lake.



    Arrived into Steep Falls, Maine, about to drop off two loaded covered hoppers for the local grain/feed mill.




    Tied back onto the local for Gilman after dropping off the hoppers.

    -Shawn K-
    MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
    ​

    Comment

    • CSRX
      13500 Post Veteran



      • Oct 2005
      • 13649
      • Lincoln, ME
      • English
      • ORTS

      #32
      I have pushed the tracks a little past Cornish, Maine, with a resolved issue I was having with a missing tile in TSRE. Going back to an older TSRE version seemed to have done the trick with old settings in place.

      YR-1 Extra, loaded oil train with LC&S power on point. This is actually a run through train from Ogdensburg, NY to Portland, ME, so it holds its power over the WMRC Mountain Subdivision, WMRC Lamoille Subdivision, and LC&S's Champlain Subdivision.




      Just west of Cornish, this is the tile that wasn't properly showing in the newer TSRE settings for some odd reason. Which was getting frustrating, because this is where the Mountains start to become pretty noticeable, especially with the track grades ranging from 0.09% to almost 2%. YR-1 with a range of power.



      Another YR-1 train, with some hard working units, showing the raises and dips in the track between Cornish and Steep Falls. Head two cars will be a drop off in Steep Falls at the small feed company, the the handful just behind it are pick ups made in Whitefield, from the local that goes to Gilman Paper.

      -Shawn K-
      MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
      ​

      Comment

      • CSRX
        13500 Post Veteran



        • Oct 2005
        • 13649
        • Lincoln, ME
        • English
        • ORTS

        #33
        laying down trackwork for Rigby Yard in South Portland, Maine.

        -Shawn K-
        MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
        ​

        Comment

        • jbtower
          Senior Member


          • Jul 2005
          • 573
          • Yorkville, Illinois, USA.
          • ORTS

          #34
          Originally posted by CSRX
          laying down trackwork for Rigby Yard in South Portland, Maine.

          I really look forward to seeing the final product Shawn!!!!
          Kevin Kelleher

          Comment

          • CSRX
            13500 Post Veteran



            • Oct 2005
            • 13649
            • Lincoln, ME
            • English
            • ORTS

            #35
            Thank Kevin. I have a long ways to go. Still another 100 miles of track to lay heading west. Keep in mind the biggest reason I'm using xtracks and the default track set of MSTS, is due to the fact the route is based on the 1981 time frame. So the line wasn't in it's best shape, and will be released under the MEC title.
            Eventually I want to have it as my base route for the WMRC as you can tell in the many photos here. Maybe eventually I'll upgrade to scalerail, but time will tell.
            -Shawn K-
            MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
            ​

            Comment

            • CSRX
              13500 Post Veteran



              • Oct 2005
              • 13649
              • Lincoln, ME
              • English
              • ORTS

              #36
              Reworking the Rigby Yard. the tight curves of the switches are making this a bit difficult. The older portion of the yard probably hasn't seen moderate changes for the style switches in years. Newer portion appears to have longer sweeping curves to accept the intermodal traffic that Pan Am occasionally sees with the Poland Spring contract. Decided to give the 6d switches a try seems 7_5d didn't give enough room for the compact feel. So far so good, but will hit a snag, as the portion towards the left of the screen, has a bit of a "kink" in the track work near the departure/inbound tracks. So adjusting will have to be needed even though it doesn't show well on the images.

              "Good enough" is going to be the thing for this yard. Hopefully St. Johnsbury Yard doesn't hold this much issue..



              -Shawn K-
              MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
              ​

              Comment

              • CSRX
                13500 Post Veteran



                • Oct 2005
                • 13649
                • Lincoln, ME
                • English
                • ORTS

                #37
                Been laying down some scenery in various spots between Portland and Brownfield. Here is a small section I've done, that's roughly 90% complete for scenery. Just a few minor details needing to be added.

                The video shows it, plus a train heading through on its way to St. Johnsbury.

                -Shawn K-
                MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
                ​

                Comment

                • CSRX
                  13500 Post Veteran



                  • Oct 2005
                  • 13649
                  • Lincoln, ME
                  • English
                  • ORTS

                  #38
                  I apologize for the lack of updates on this route. I'm sure it seems like just another vaporware project. Believe me, it's not, but I feel the same way.

                  My previous job, I have little time to sit down and do anything ORTS related. I ended up leaving that job, for another, back to my home state of Maine. The new job I have a four-day work week, versus 5 or 6, so I get a little bit more free time. Obviously with summertime, I'm out and about with family, but come winter, I'm not going to be outside much. Not a winter person, so I am sure more updates with this project will take place. Especially because I want to finish it and start on another one that is actually former MEC tracks as well. One I currently work on.

                  I'm sure too, some have noticed I have started tackling repaints again, and again, I think it will just be another semi large set, especially seems it will be NBSR/EMRY related.
                  -Shawn K-
                  MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
                  ​

                  Comment

                  • CSRX
                    13500 Post Veteran



                    • Oct 2005
                    • 13649
                    • Lincoln, ME
                    • English
                    • ORTS

                    #39
                    Even though the era for this route is going to be set between 1976-1983, I've decided to relay the track work with ScaleRail. This is actually going to start all the way at the beginning in Portland, as some of the X-Tracks sections I used, do not have the same pieces for Scalerail, which is perfectly okay, gives me a reason to go back and retackle the horrible grade changes I made at the beginning before I learned a better way.

                    Needless to say, laying the tracks for Rigby Yard is actually a breeze with ScaleRail. Not nearly as time consuming as it was with X-Tracks. So far at the moment, majority of the north side of the yard has been laid out, whith the exception of the north main and the west end being tied back in. The next project will be tackling the south side of the yard, with it's massive classification yard, engine terminal, and car shops.

                    As this is during the 76-83 era, It will not include the mainline that swoops around the yard, that came into play in the early 2000's when Amtrak Downeaster started running. Instead, this will feature the dual main line right down the middle of the yard with numerous cross-overs between the west end of the yard, and Deering Jct.

                    Stepping away from the repaints and ORTS in general, finally gave me some time to myself to not feel burnt out. Would like to focus on this project, even if I only spend an hour or so a day to tackle a little bit of track work here and there.

                    -Shawn K-
                    MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
                    ​

                    Comment

                    • eric
                      9500 Post Veteran and Administrator



                      • Dec 2002
                      • 9587
                      • NS MP245.4 CNO&TP South District
                      • English, SQL
                      • General

                      #40
                      Good luck with the conversion to Scalerail. Best thing I did with my routes.

                      Originally posted by CSRX
                      Stepping away from the repaints and ORTS in general, finally gave me some time to myself to not feel burnt out. Would like to focus on this project, even if I only spend an hour or so a day to tackle a little bit of track work here and there.
                      This....

                      Burnout is very real. You simply cannot work on the same thing week in week out and stay engaged...

                      I try to spend no more than a month focused on any one project -- I'll work on track work for a week, scenery for a week, model building for a week. Rinse, repeat, and usually change routes entirely after a month or move to an entirely different section of the original route.
                      If you like what you see here at Trainsim.com, be it the discussions and knowledge in the forums, or items available in our library, I hope you'll consider a paid membership to help support keeping the site operating.... Thanks!

                      Comment

                      • CSRX
                        13500 Post Veteran



                        • Oct 2005
                        • 13649
                        • Lincoln, ME
                        • English
                        • ORTS

                        #41
                        Thanks!
                        Agreed, I've been burn out by ORTS for some time now.. Slowly dealing with the route and ignoring most other things is about all I can do lately.

                        Anyways, been tackling the south side of the yard a bit and seeing how much I can fill the yard up with stuff. haha







                        -Shawn K-
                        MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
                        ​

                        Comment

                        • eric
                          9500 Post Veteran and Administrator



                          • Dec 2002
                          • 9587
                          • NS MP245.4 CNO&TP South District
                          • English, SQL
                          • General

                          #42
                          Sweet. I'd rather spend half a day switching out the yards there than running 45 minutes on a mainline... That's a puzzle waiting to be solved.
                          If you like what you see here at Trainsim.com, be it the discussions and knowledge in the forums, or items available in our library, I hope you'll consider a paid membership to help support keeping the site operating.... Thanks!

                          Comment

                          • CSRX
                            13500 Post Veteran



                            • Oct 2005
                            • 13649
                            • Lincoln, ME
                            • English
                            • ORTS

                            #43
                            This will be a fun one, as it served the main artery for both Boston & Maine and Maine Central, with the Portland Terminal Company in charge of all the switching between this yard, and 11 others in the Portland, South Portland, and Westbrook area. So lots of commodities seen in this yard during the 1970's and 80's with a variety of lumber, oil, gas, coal, paper products, fish, cement, steel, and numerous other commodities to and from B&M, MEC, Grand Trunk, and the shipping facilities.

                            Overall, the main yard is done. Only thing left is connecting the four stub tracks seen on the left, to the turntable, as well as finish the Wye section down below the yard that connects to the Turner Island and Cushing Point Branch.

                            -Shawn K-
                            MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
                            ​

                            Comment

                            • CSRX
                              13500 Post Veteran



                              • Oct 2005
                              • 13649
                              • Lincoln, ME
                              • English
                              • ORTS

                              #44
                              Laid out track down to Turner Island. A little two mile branch that extends off the west end of Rigby Yard. I do believe at one point this was part of the Eastern Route that the B&M originally purchased and started with, but could be wrong, as I recall another line north or Portland being part of that as well as the WN&P line. (Worcester, Nashua & Portland).

                              Anyways, a look at the terminal for Turner Island, where it did a lot of ship to train transloading.



                              Little bit to the west is "The Cape" which has a run around track, a freight house, and a Mexican Petroleums facility, as well as the branch off to Ferry Village, which will be the next section to add in, that serves California Oil Terminal, Pine State By-Products, US Navy, and General Electric Corp.



                              Next up is "Todd Bath" which serves a steel transload facility, currently known as Casco Bay Steel. Not entirely sure if it was known by the same name in the late 1970's.




                              And then finally, we have two tracks for Hannaford Brothers, which is a huge distribution facility from rail to truck on dry and cold grocery goods.


                              ​

                              After the next step towards Ferry Village, I will be progressing on the Yard 6 location along the Fore River, which serves Imery's Pigments, Sprague Terminals, Cianbro, and a coal dock, then the great push towards the biggest challenge, which will be the Commercial Street Yards, that extend from Fore River all the way towards Back Bay.
                              -Shawn K-
                              MEC Mountain Subdivision - Trackwork 70%, Scenery 35%
                              ​

                              Comment

                              • jbtower
                                Senior Member


                                • Jul 2005
                                • 573
                                • Yorkville, Illinois, USA.
                                • ORTS

                                #45
                                Shawn so far it looks amazing, keep us up to speed!
                                Kevin Kelleher

                                Comment

                                Working...