Hi all, I downloaded the Route Prr East Reg 2, which seems to be very nice and detailed: I'm preparing some activities that leave me perplexed: in the electrified paths the power supply cables are missing; the piling is present. I tried to to perform the “wires on connection” present in the Prr East Rreg 2 folder, but the result is the answer: “the network unit or connection to which the reference catenary wires on.lnk is not available". Make sure the disk is inserted correctly or the network resource is available and try again”.
This leaves me puzzled because I do not have any disk having downloaded the route from this site, and I do not know which link is being talked about. I think I need help.
Thanks in advance and best regards.
P.S. I apologize for my very poor English
This leaves me puzzled because I do not have any disk having downloaded the route from this site, and I do not know which link is being talked about. I think I need help.
Thanks in advance and best regards.
P.S. I apologize for my very poor English




.

Comment