Hi Robert,
An empty 2 rake train weighs just over 5,000 tonnes so I'm not sure why you would think the couplers are prone to disintegration. Ultra couplers are fitted to the rolling stock which I have been advised, have the same tensile strength as standard AAR couplers but have greater vertical volume in the coupler body and knuckle.
If the head end power and DPU is controlled appropriately by the driver then there shouldn't be a problem. The drivers are highly skilled and trained. I suspect that if a coupler failure occurred and the loco computers indicated it was due to poor train handling then that drivers future employment prospects with the company would not be very rosy.
Check out the BHP Billiton 'Moving Mountains' video on youtube for an overview of this railway.
Rocketboy1950 has some great videos on youtube as well. The following shows the rear most DP units an empty 3 rake train (336 ore cars) starting (around 2 minutes into the video). They start and accelerate them slowly.
Cheers,
Marek.
An empty 2 rake train weighs just over 5,000 tonnes so I'm not sure why you would think the couplers are prone to disintegration. Ultra couplers are fitted to the rolling stock which I have been advised, have the same tensile strength as standard AAR couplers but have greater vertical volume in the coupler body and knuckle.
If the head end power and DPU is controlled appropriately by the driver then there shouldn't be a problem. The drivers are highly skilled and trained. I suspect that if a coupler failure occurred and the loco computers indicated it was due to poor train handling then that drivers future employment prospects with the company would not be very rosy.
Check out the BHP Billiton 'Moving Mountains' video on youtube for an overview of this railway.
Rocketboy1950 has some great videos on youtube as well. The following shows the rear most DP units an empty 3 rake train (336 ore cars) starting (around 2 minutes into the video). They start and accelerate them slowly.
Cheers,
Marek.






Comment