Really offtopic , how in the world did I manage to set up this browser with the font in the editor being light grey on a white background, talking about low contrast......................
I recently found the brake release time varies markedly depending on if Graduated release is set or not. With Graduated release off the behovior appears to be OK taking around 1 minute 20 seconds to release the brakes on a 208 vehicle long train. Now I do not have any data on what this should be but this appears to be reasonable.
Now with graduated release checked the release is way to slow. On the current loco hauled pass's used in Victoria the braking system used is standard twin pipe with no electrical connections down the train other than "Head end power". I have studied the brakes on these trains carefully to try and get an idea on there behavior and performance. The Brake release on a 5 car train takes under 3/4's of a second. ON release the pressure rises within 1/4 of second to around 67 PSI then takes the rest of the time (1/2 of a second) to rise to the line pressure of 70PSI , OR on the other hand takes over 5 seconds, as I said way to slow. On the 208 vehicle train this time runs out to nearly 6 minutes.
PS, I also noticed the terrain blocking the tunnel entrances bug has been fixed............
Lindsay
I recently found the brake release time varies markedly depending on if Graduated release is set or not. With Graduated release off the behovior appears to be OK taking around 1 minute 20 seconds to release the brakes on a 208 vehicle long train. Now I do not have any data on what this should be but this appears to be reasonable.
Now with graduated release checked the release is way to slow. On the current loco hauled pass's used in Victoria the braking system used is standard twin pipe with no electrical connections down the train other than "Head end power". I have studied the brakes on these trains carefully to try and get an idea on there behavior and performance. The Brake release on a 5 car train takes under 3/4's of a second. ON release the pressure rises within 1/4 of second to around 67 PSI then takes the rest of the time (1/2 of a second) to rise to the line pressure of 70PSI , OR on the other hand takes over 5 seconds, as I said way to slow. On the 208 vehicle train this time runs out to nearly 6 minutes.
PS, I also noticed the terrain blocking the tunnel entrances bug has been fixed............
Lindsay

















Comment