The BVE TOEI Shinjuku line have been updated on 24/09. This route is written for BVE 2.6 only.
The drivable section is extended from Ichigaya Station to Sasazuka Station. That means the full TOEI Shinjuku route plus through services onto Keio Electric Railway 'Keio Shinsen' is drivable.
In normal operations, these thru trains sometimes run through to Hashimoto on Keio Main/Sagamihara Line. This could also be simulated here on BVE if the Keio Sagamihara Line had been downloaded earlier.
Downloads at http://www53.tok2.com/home2/miki/bve_addons.htm
under:
路線 :都営新宿線ver1.21
å†ç¾åŒºé–“ :本八幡~新宿~笹塚(約27.1㎠žï¼‰
ダウンãƒãƒ¼ãƒ‰ 最終更新日 更新内容/備考
路線データ (Route File)
オブジェクトデータ (Object)
サウンドデータⅰ (Sound 1)
サウンドデータⅱ (Sound 2)
サウンドデータⅲ (Sound 3)
The drivable section is extended from Ichigaya Station to Sasazuka Station. That means the full TOEI Shinjuku route plus through services onto Keio Electric Railway 'Keio Shinsen' is drivable.
In normal operations, these thru trains sometimes run through to Hashimoto on Keio Main/Sagamihara Line. This could also be simulated here on BVE if the Keio Sagamihara Line had been downloaded earlier.
Downloads at http://www53.tok2.com/home2/miki/bve_addons.htm
under:
路線 :都営新宿線ver1.21
å†ç¾åŒºé–“ :本八幡~新宿~笹塚(約27.1㎠žï¼‰
ダウンãƒãƒ¼ãƒ‰ 最終更新日 更新内容/備考
路線データ (Route File)
オブジェクトデータ (Object)
サウンドデータⅰ (Sound 1)
サウンドデータⅱ (Sound 2)
サウンドデータⅲ (Sound 3)


Comment