    Hi folks,

    i have discovered a major problem:

    If a train is PUSHED (slowly) over a track to track junction (Switch B-A), sometimes the train entirely jumps to the other track. This seems to be a major problem in the positioning algorithm! However, the problem seems to depend on the internal timing of OR, as it occurs only sporadic. The propbem occurs also during pushback over switch C-D, therfore it is not depending on the specific situation at switch B-A.

    Track distance at the referred point is approximately 4.2m, used rail system is UKN. Test-train length is around 70m.

    Placement of the junction is:


    Switch A, 0deg
    ------------ ---------- ------ Track 2, 0deg
    | Sw C \ Junction, 0,15deg elevation
    ------------ ---------- -<<<<< pushed back train on Track 1
    | / Switch B, 0,3deg elev.
    -----------------------|
    | Sw D

    Kind regards
    Last edited by KingOfLions; 11-08-2012, 07:33.